units
CIV3248
Faculty of Engineering
Refer to the specific census and withdrawal dates for the semester(s) in which this unit is offered.
| Level | Undergraduate |
| Faculty | Faculty of Engineering |
| Offered | Clayton First semester 2012 (Day) |
| Coordinator(s) | A/P A Bouazza and Dr G Mudd |
Overview of concepts relating to groundwater resources and seepage, with emphasis on seepage containment in reservoirs, ponds, soil pollution and its avoidance, focusing on soil behaviour and its effect on seepage, groundwater percolation and migration of contaminant in the nearfield of waste containment facilities. Focus will also be on the function, design and construction of engineered soil barriers to prevent leakage from water reservoirs, ponds or to isolate different types of waste.
Tests: 20%
Design assignment: 40%
Examination (2 hours): 40%.
Students are required to achieve at least 45% in the total continuous assessment component (assignments, tests, mid-semester exams, laboratory reports) and at least 45% in the final examination component and an overall mark of 50% to achieve a pass grade in the unit. Students failing to achieve this requirement will be given a maximum of 45% in the unit.
2 hours lecture, 2 hours practice class and 8 hours private study per week.